GATEWAY PROJECT – SHEFFIELD CATHERDRAL ROOFLIGHT
We undertook this contract at Sheffield Cathedral and had to scaffold from below, which was a challenge in itself! We assemble our system in our workshop first, as a quality control measure and then flat pack to be reassembled on site. We had to follow strict guidelines as to what we could supply and stringent timeframes.
Hexagonal rooflight around 3 metres in 6 sides